IEC 61850 / MMS / TASE.2  Training and Solution Seminar

Date£ºMay 17-18,2005      site£ºBeijing China 

Teacher£ºRalph Mackiewicz (SISCO)  website: www.sisconet.com 

SISCO's mission is to provide world-class, real-time communications and integration solutions to OEM and end-user customers in the energy utility, manufacturing, and other vertical industries based on open internationally accepted standards.

Description

IEC61850 is an important new international standard for substation automation that will

have a very significant impact on how electric power systems are designed and built for

many years to come. IEC61850 is a part of the International Electrotechnical

Commission¡¯s (IEC) Technical Committee 57 (TC57) architecture for electric power

systems. The model-driven approach of the TC57 standards, including IEC61850, is an

innovative approach that requires a new way of thinking about substation automation that

will result in very significant improvements in both costs and performance of electric

power systems.

SISCO¡¯s IEC61850 Tutorial takes a practical approach to helping utility engineers

understand how IEC61850 can be used to benefit their organization. The tutorial begins

by explaining why these standards are important, how they differ from legacy

technology, and how these differences will benefit users. The student is then guided

through the IEC61850 standard itself to illustrate how IEC68150 delivers these benefits

via standardized device, object, and service models. Definitions and overviews of the

most important concepts will be presented with detailed examples that relate to actual

power systems. The tutorial is concluded with a hands-on session in which the attendees

will install and configure an actual IEC61850 application and network analysis software

on their own laptop computers and communicate over an Ethernet network with an

IEC61850 server.

Detailed Outline

1. Day 1

1.1. Agenda Review

1.2. What is IEC61850?

1.3. Why Standards are Needed

1.3.1. Interoperability and Integration

1.3.2. How Systems Evolved

1.3.3. Protocol Standards

1.3.3.1.Overview

1.3.3.2.Limitations of Legacy Protocols

1.3.3.3.New Approach of IEC61850

1.3.4. Application Programming Interface (API) Standards

1.3.4.1.Overview

1.3.4.2.Limitations of Legacy API Standards

SISCO IEC61850 Tutorial ¨C Description and Detailed Outline Page 2

1.3.5. Data Modelling Standards

1.3.5.1.The Common Information Model (CIM)

1.3.5.1.1. Brief Review of IEC619780/IEC61968

1.3.5.2.The Generic Interface Definition

1.3.6. The IEC TC57 Model Driven Architecture for Electric Utility Integration

1.3.6.1.Applicability to Other Industries

1.3.6.2.Benefits

1.4. Comparison of DNP3 (IEC60870-5) and IEC61850

1.4.1. Comparison of the Origins

1.4.2. Comparison of Standard Structure

1.4.3. Comparison of Profiles

1.4.4. Comparison of Services

1.4.5. Conclusion

1.5. BREAK

1.6. Benefits of IEC61850

1.6.1. Keys to Justification

1.6.2. Substation Benefits

1.6.3. Substation to Control Center Benefits

1.6.4. Relay to Relay Interfacing Benefits

1.6.5. Transducer Wiring Benefits

1.6.6. Conclusion

1.7. IEC61850 Standard

1.7.1. How to Read

1.8. IEC61850 Technical Parts

1.8.1. Virtual versus Abstract

1.9. IEC61850 Server Object

1.10. IEC61850 Logical Devices

1.10.1. Application

1.11. LUNCH

1.12. Logical Nodes (LN)

1.12.1. Definition and Structure

1.12.2. Listing of Logical Nodes Defined in IEC61850

- 2 -

SISCO IEC61850 Tutorial ¨C Description and Detailed Outline Page 3

1.12.3. Logical Node Naming

1.13. Common Data Classes (CDC)

1.13.1. Base Types

1.13.2. Listing of Common Data Classes Defined in IEC61850

1.13.3. Functional Constraints

1.13.4. Detailed Review of CDCs:

1.13.4.1. Single Point Status (SPS)

1.13.4.1.1. Trigger Options

1.13.4.1.2. Mandatory/Optional Parameters

1.13.4.2. Double Point Status (DPS)

1.13.4.3. Integer Status (INS)

1.13.4.4. Controllable Double Point (DPC)

1.13.4.5. Controllable Integer (INC)

1.13.4.6. Protection Activation (ACT)

1.13.4.7. Measured Value (MV)

1.13.4.8. Device Name Plate (DPL)

1.13.4.9. Logical Node Name Plate (LPL)

1.14. BREAK

1.15. Logical Node Descriptions and Example Object Names

1.15.1. Physical Device LN (LPHD)

1.15.2. Common Logical Node (LLN0)

1.15.3. Circuit Breaker (XCBR)

1.15.3.1. Local/Remote Operation Status Object Name

1.15.3.2. Breaker Position Object Name

1.15.3.3. Mapping to IEC61850-8-1 (MMS) Names

1.15.4. Switch Controller (CSWI)

1.15.5. Measurements (MMXU)

1.15.5.1. Complex Measured Values (CMV)

2. Day 2

2.1. Abstract Communications Service Interface (ACSI)

2.1.1. ACSI Service Model

2.1.2. ACSI Objects and Mapping to MMS per IEC61805-8-1

2.1.3. ACSI Services

- 3 -

SISCO IEC61850 Tutorial ¨C Description and Detailed Outline Page 4

2.1.4. ACSI Server Object

2.1.4.1.Application Communication Model

2.1.5. Logical Device Object and Services

2.1.6. Logical Node Object and Services

2.1.7. Data Object and Services

2.1.8. ACSI Service Mapping

2.1.9. Data Set Object and Services

2.1.10. Reporting Model

2.1.10.1. Unbuffered Reports

2.1.10.2. Buffered Reports

2.1.11. Control Model

2.1.11.1. Direct Control

2.1.11.2. SBO Control

2.1.11.3. Control with Enhanced Security

2.1.11.4. IEC61850-9-1 Mapping of Controls to MMS

2.1.11.5. Examples

2.1.11.5.1. Select Before Operate

2.1.11.5.2. Select with Value

2.2. BREAK

2.3. IED to IED Data Exhange

2.3.1. Multi-cast Messaging Model

2.3.2. Generic Substation Status Event (GSSE)

2.3.3. Generic Object Oriented Substation Event (GOOSE)

2.3.4. Reliable Multicast

2.4. Substation Configuration Language (SCL)

2.4.1. Overview and Application

2.4.2. File Types

2.4.3. Sample SCL File

2.4.4. SCL Future

2.5. IEC61850-9-2 Process Bus

2.5.1. Sampled Measured Values (SMV) Objects and Services

2.5.2. Application

2.6. IEC61850 Profiles

2.7. UCA2.0 to IEC61850 Migration

- 4 -

SISCO IEC61850 Tutorial ¨C Description and Detailed Outline Page 5

2.7.1. Comparison of the Documents and Terminology

2.7.2. Migration Issues

2.7.2.1.Object Models

2.7.2.2.Reporting

2.7.2.3.Client Report Handling

2.7.2.4.Object Name Changes

2.8. UCA International Users Group

2.8.1. Organization

2.8.2. Process

2.8.3. Benefits

2.9. LUNCH

2.10. Hands-On: Using IEC61850

2.10.1. SISCO IEC61850 Products

2.10.1.1. MMS-EASE Lite For Embedded Systems

2.10.1.2. AX-S4 MMS IEC61850 Client/Server for Windows

2.10.1.2.1. Architecture

2.10.1.2.2. Application

2.10.1.2.3. Future

2.10.2. Installing and Configuring AX-S4 MMS

2.10.2.1. Hands-On

2.10.3. Ethernet Network Analysis using Etherreal

2.10.3.1. Hands-On

2.11. Conclusion

¡¡

Duration: 2 days

Fees:   $ 200  per person (This seminar just need fees for eating and documents,training fee is free.)

¡¡

¡¡